All the pieces of the upper are sewn together, forming the final aspect of the shoe. The lining is also sewn on the edge of the shoe quarters.
Assembly of the tongue on a pair of Rubis 484.
Assembly of the buckle with the quarter.
Sewing the two pieces of the inner lining.
The lasting of these Milan 345 is finished. The Goodyear welt will soon be prepared.